{"schemaVersion":1,"recordType":"legal-article","id":"law:eri:code:civil:2015:article:2293","workId":"law:eri:code:civil:2015","expressionId":"law:eri:code:civil:2015:en","title":"Defective Performance of the Task","number":"2293","language":"en","canonicalUrl":"https://eriatlas.com/law/civil-code-2015/article/2293/","hierarchy":{"book":"BOOK VI - SPECIAL CONTRACTS","title":"TITLE III - CONTRACTS FOR THE PERFORMANCE OF SERVICES","chapter":"Chapter 2. - Independent Work","section":"Section 1. - General Provisions","paragraph":null},"paragraphs":[{"id":"p1","number":"1","text":"Where it appears, during the currency of the contract, that the contractor is performing the task in a defective manner or contrary to the contract, the client may fix a reasonable time limit for the Contractor to correct his defective or inadequate performance.","canonicalUrl":"https://eriatlas.com/law/civil-code-2015/article/2293/#p1","sourceTargets":[{"sourceId":"civil-code-2015-en","pdfPage":635,"url":"https://eriatlas.com/sources/civil-code-2015/page/635/?article=2293&paragraph=p1#article-2293-p1"}]},{"id":"p2","number":"2","text":"If, when this limit expires, the contractor has not corrected the defective or nonconforming performance, the client may terminate the contract immediately.","canonicalUrl":"https://eriatlas.com/law/civil-code-2015/article/2293/#p2","sourceTargets":[{"sourceId":"civil-code-2015-en","pdfPage":636,"url":"https://eriatlas.com/sources/civil-code-2015/page/636/?article=2293&paragraph=p2#article-2293-p2"}]},{"id":"p3","number":"3","text":"The client may also claim, in such a case, damages from the contractor.","canonicalUrl":"https://eriatlas.com/law/civil-code-2015/article/2293/#p3","sourceTargets":[{"sourceId":"civil-code-2015-en","pdfPage":636,"url":"https://eriatlas.com/sources/civil-code-2015/page/636/?article=2293&paragraph=p3#article-2293-p3"}]}],"caution":"This is the 2015 English-language edition attributed in its front matter to the Ministry of Justice. Eri Atlas has not independently verified the translation, later changes, or whether the text is currently in force. Nine passages are incomplete in the available scan and are identified where they occur."}