Planning
Massawa–Tesseney road
Feasibility studies and design for a road corridor and coastal infrastructure.
Massawa to Tesseney · Road and coastal infrastructure preparationWhat was planned
Prepare technical studies, environmental and social assessments, detailed designs and tender documents.
Government of Eritrea · AfDB preparation notice
What we can see
The June 2026 notice seeks consultants for project preparation. It is evidence of planning, not evidence that road construction has started.
The map marks Massawa as a corridor endpoint, not the proposed road alignment. The procurement notice is historical; check the issuer for current opportunities.
Evidence timeline
- Feasibility and design consultancy noticeAfrican Development Bank
Your next step
Read the preparation noticeCheck current arrangements with the publisher. A listed project is not an open investment offer.